Cycling Protocol Using EpiMark™ Bisulfite Conversion Kit (E3318)

Protocol

  1. Initial denaturation:
    95°C  30 seconds
    35–40 cycles:
    95°C  15 seconds
    45–55°C  30 seconds
    68°C  1 minute/kb
    Final extension:
    68°C  5 minutes